Characteristics of the object

Construction of a grain transshipment complex of 36 thousand tons (new construction) - general contract.

  • Installation of elevator metal structures.
  • Installation of grain drying equipment from Bonfanti.
  • Installation of transport and technological lines of the complex.
  • Installation of six Symaga silo tanks with a total capacity of 36,000 tons.
  • Installation of aspiration equipment.
  • Installation and debugging of a remote automatic control system for a 50 thousand ton elevator. simultaneous preservation.
  • Installation of gravity equipment.
  • Commissioning and launch of the elevator.
slide-1
slide-2
slide-3
slide-4
slide-5
slide-6
slide-7

Customer comment

Implementation period:

2016–17