Installation of equipment for LLC “Company “Ukrmill”
ODESSA REGION

Company:
LLC “Company “Ukrmill”
Location:
LLC “Company “Ukrmill”
Characteristics of the object
The third stage of construction of the elevator was planned and implemented in 2013.
- Installation of silo tanks with a total capacity of 140,000 tons.
- Installation of metal structures at the wagon unloading station.
- Installation and commissioning of aspiration networks.
- Installation of dust-insulating cover for belt conveyors.
- Installation of transport equipment.
- Installation and debugging of a remote automatic control system for an elevator.
- Construction of a floor storage warehouse with a capacity of 10,000 tons.
- Installation of technological metal structures.
- Installation of metal structures for car reception canopy.
Customer comment
Implementation period:
2009-2013