LLC "MV Cargo" (CARGILL)

When designing the MV Cargo grain handling complex in Yuzhny, the terminal management set the task of creating a modern, high-performance terminal in a limited area of the port. The project was examined by the EBRD and IFC and received high marks in terms of manufacturability, environmental friendliness and energy saving.
Development of project documentation at the “P” and “R” stages. "Terminal for reloading grain cargo at berth No. 25, with a cargo turnover of 4,000,000 tons/year."
Object characteristics:
The project for the construction of a grain transhipment terminal with a capacity of 289.63 thousand tons of simultaneous grain storage provides for:
- Granary No. 1 with a total capacity of 102.515 thousand tons of grain, consisting of seven metal silos. All silos are equipped with thermometry systems. Aeration systems are installed in three silos.
- Granary No. 2 with a total capacity of 115.115 thousand tons of grain, consisting of seven metal silos. All silos are equipped with thermometry systems. Aeration systems are installed in three silos.
- Composition of grain No. 1 with a total capacity of 36 thousand tons of grain.
- Composition of grain No. 2 with a total capacity of 36 thousand tons of grain.
- receiving grain from road transport: two lines with a capacity of 550 t/hour, one line with a capacity of 700 t/hour.
- Reception of grain from railway transport: unloading of railway cars is organized in two streams with a capacity of 1500 t/h each.
- grain drying and cleaning: separator 400 t/h, grain dryers with capacity Q = 71 t/h (when drying corn from 28 to 14%).
- supply for water transport: two technological lines, hopper scales and a ship-loading machine with a capacity of 200 t/hour.
- high-quality grain accounting: own laboratory. Sampling is carried out using automatic samplers.
Customer comment
Cooperation period:
2015-16