Back

Installation of equipment for LLC "Novotech-Terminal"

tov-novoteh-terminal
Company:
LLC "Novotech-Terminal"
Location:
Ukraine, Odessa, Odessa region, Customs Square, 1
Characteristics of the object

Port grain transshipment terminal. Upon completion of construction, the simultaneous storage capacity will be 110 thousand tons. According to the National Maritime Rating of Ukraine, it is the most modern and efficient terminal today with a minimum construction period. Total capacity - 61,000 cubic meters, shipment to special containers - 500 t/h, reception from the vessel by a mobile unloader - 250 t/h, loading to the vessel - 1000 t/h, average capacity of transport and technological lines 250-1000 t/h.

Types of work performed:

Development of design documentation at the P&R stage of a grain terminal project with an annual turnover of 3,000,000 tons.

  • Construction of the 4th stage of the grain transshipment complex - general contract 2018
    - supply of silo tanks to Symaga (25 thousand tons).
    - production of conveyor equipment 500-1000 t/h (200 linear meters), stripping augers 200 t/h, gravity equipment (10 t.).
    - installation of silo tanks, stripping augers, conveyor and gravity equipment.
  • Construction of the 2nd stage of the grain transshipment complex - general contract 2017
    - supply of silo tanks to Symaga (50 thousand tons).
    - production of aspiration equipment for the 2nd stage of the grain transshipment complex.
    - manufacturing of weighing equipment: hopper scales.
    - production of high-performance transport equipment 500-1000 t/h: belt conveyors, elevators, as well as gravity equipment (80 t).
    - installation of a silo park (storage volume 50 thousand tons), installation of conveyor equipment (980 m.p.), installation of aspiration equipment (40 units), installation of gravity equipment.
    - automation. Smart scales.
  • Construction of the 1st stage of the grain transshipment terminal (2016):
    - production, supply and installation of elevator metal structures.
    - production of transport equipment: belt and scraper conveyors, elevators 250-1000 t/h.
    - installation of technological equipment and gravity flow.
    - project development, manufacturing, installation of aspiration equipment of the 1st stage of the terminal.
slide-1
slide-2
slide-3
slide-4
slide-5
slide-6
slide-7
slide-8
slide-9

Customer comment

Period of cooperation:

In progress 2016-2017.