Installation of equipment for ZPK Brooklyn-Kyiv LLC (Louis Dreyfus Group)

After completion of construction, the simultaneous storage capacity will be 240 thousand tons, and the berth with a length of 254 m and a depth at the quay wall of 13.5 m will allow processing Panamax class vessels with a carrying capacity of 60 thousand tons. The design capacity of the complex will allow processing up to 2.5 million tons. tons of grain per year.
The complex includes:
- station for unloading railway cars for 16 units of simultaneous unloading with a total intensity of 1000 t/h;
- a vehicle unloading station with an unloading rate of 500 t/h;
- hopper scales with a capacity of 1500 t/h (water loading line);
- three silo-type compositions;
- transport equipment system
Design work
- Design of the “Grain transshipment complex in the rear of berth No. 1-z in the Androsovsky pier area.”
- Construction and installation
- Installation of a grain transshipment complex with a simultaneous storage capacity of 240 thousand tons.
Aspiration
- Development of the PU (aspiration) section at the “P” and “R” stages of the terminal project:
- wagon unloading stations;
- units of transfers and bulk trays;
- nori boot;
- bunker scales.
Automation
-
Design, manufacture of power cabinets and automation panels, installation, debugging and commissioning of electric power and remote automated terminal control systems.
Equipment manufacturing
Transport equipment:
- Scraper conveyors ZEO-DC, Q=350-500 t/h;
- Reversible scraper conveyors ZEO-DC-500 t/a;
- Belt conveyors ZEO-BC, Q=500-1500 t/y;
Aspiration equipment:
- Local special filters ZEO-FU, Q=2000 m3/h;
- Local special filters ZEO-FG/FV, Q=1600 m3/h;
- Filter cyclones ZEO-FC, Q=9000 m3/g;
- Dustproof shelter ZEO-DH, 340m.
Hopper container:
The equipment is designed specifically for the transshipment of bulk cargo without the use of a ship loader.
Weighing equipment:
-
Weight scales ZEO-BV, Q=1500 t/h;
Manufacturing of metal structures and gravity equipment for grain terminals.
Customer comment
Cooperation period:
2012-2017